|
|||||
![]() |
|||||
Water Case Study
Goodrich WwTWClient Kelda Water Services Scope The project involved the construction of new inlet chamber, installation of new bypass pipework, construction of compound to house new inlet screen, control panel and magnetic flow meter. Installation of electrical power / control / monitoring equipment. Fabrication of new inlet and outlet thin walled stainless steel pipework and step-over. Extension to existing concrete road and installation of safety handrailing.
|
|
||||
Copyright © 2010, Adroit Construction plc. All Rights Reserved. Registered in England and Wales, No 00567427 Home Capability Sectors Our Clients Standards Health & Safety Environmental News Contact Us Adroit Group Adroit Modular |
|||||