Renewable Energy Case Study
Llyn Brenig Hydro Generation SchemeClient United Utilities - Dwr Cymru Objective What did the project involve? Power plant will operate from the compensation out flow ranging from 180 to 200L/s with an available pressure of 48m head and producing up to 60kW which is the limit of the incoming supply to the site. Package includes a single jet, horizontal Turgo type turbine directly coupled to an induction generator arranged to export all of the generated power to the grid system. Our scope of supply under CDM regulation covers the design, supply, installation and commissioning of complete hydro power generation system involving all civil, mechanical and electrical work.
|
|
||||