Renewable Energy Case Study

 

Ystradefellte Hydro Generation

Client United Utilities
Location Ystradfellte. Phase 2 feasibility study
Value £300k

Scope
Energy recovery from raw water pipeline to a potable water treatment plant up to 420MW per year. Local re-use of generated power with some export to the grid system.

The project involved the integration of packaged hydro turbine driven generator at the works inlet with changes to the coagulation process and control system. To be located within existing buildings in a National Park area.